Electric boat propulsion for projects in Thailand

Start with the timetable
For a sightseeing boat or passenger ferry, record the distance and service speed of each leg, the number of trips per day, passenger load and time at berth. A short charging stop between trips changes the battery and shore-power requirements compared with overnight charging.
What equipment can be integrated?
CIMC BlueWater’s electric propulsion system combines a thruster, propulsion converter, energy storage system (ESS), energy management system (EMS), AC/DC distribution and shore connection. Its hybrid layout also includes a fuel generator set.
Which propulsion units are listed?
The product brochure lists electric outboards rated 8–45 kW, waterjet propulsion units rated 8–20 kW and electric pod units rated 50–250 kW. To narrow the selection, provide the hull dimensions, displacement, draft and required service speed.
A battery-swap reference from China
Jining Ganghang 6006 is a Chinese inland vessel used to demonstrate an integrated ship-to-shore battery-swap solution. For a Thai project considering battery exchange, identify the terminal footprint and lift or handling constraints alongside the vessel’s energy needs.
Request a review for your route
Send the route, operating hours, berth time, available shore power and whether the project is a newbuild or a retrofit. The international sales team can discuss the electric and hybrid configurations against those inputs.
Source: CIMC BlueWater company brochure · 4, 6
International sales